Energy infrastructures
In the metropolitan area of Barcelona there are three main types of energy infrastructures: the electricity grid, infrastructures related to natural gas and those related to oil products. The management of these infrastructures is regulated by the Government of Spain and the Catalan Government, and it is carried out by various companies, such as Red Eléctrica Española, ENAGAS or Compañía Logística de Hidrocarburos (CLH).

Electrical energy
Generation corresponds to the electricity production process. There are ordinary-regime (OR) and special-regime (SR) producers. Regarding the OR, since 2008, conventional power plants (CPP) are being replaced by combined cycle power plants (CCPP), more ecological and efficient than the former ones.
In the metropolitan area there are two large CCPP for the generation of electricity in OR:
- Plant of the port of Barcelona: composed of two groups, Port Barcelona 1 and Port Barcelona 2, with installed gross powers of 447 MW and 445 MW respectively. It is operated by Gas Natural Fenosa.
- Plant of Besòs: composed of three groups, Besòs 3 (419.3 MW) and Besòs 5 (873.2 MW), operated by ENDESA Generación, and Besòs 4 (406.6 MW), operated by Gas Natural Fenosa.
They have jointly a total gross power of 2,590.8 MW. In 2011, they generated 6,182 GWh.
Concerning to OR, the main production facilities are ecoparks, the energy recovery centre of PIVR (Waste Recovery Integral Plant) of Sant Adrià de Besòs, the old tank of Vall d'en Joan landfill and the energy generation plant of Zona Franca.
Generation of electrical energy is a deregulated activity in a free competition market. There is no regulated planning, despite it is subject to administrative approval.
Transport is the transmission of electrical energy through the network to supply it to various agents and to carry out international exchanges. It is a regulated activity depending by law on a single operator, Red Eléctrica Española (REE), which is responsible for the execution of the plan of the Ministry of Industry, Tourism and Trade.
In the metropolitan area, the electricity network consists of a transport grid dominated by secondary transport lines, of 220 kV, with a very limited number of primary transport lines, of 400 kV. The main nodes of the 400 kV network in the vicinity of the metropolitan area are Sentmenat and Rubí, and the only 400 kV substation located within the metropolitan area is the one from Begues. A 220 kV network articulates from these nodes, with the main objective of bringing energy to the main consumption points, from which it is distributed through a medium voltage grid (mostly 25 kV).
Distribution is the construction, operation and maintenance of distribution facilities designed to supply electrical energy to consumption points.
Trading involves the electrical energy purchase and sale. This activity is a deregulated activity in a free competence market and, consequently, it has no specific planning or regulation.
-
Xarxes fixes
El desplegament de la fibra òptica ha substituït completament el cable de coure. El 2024 es va completar el tancament de les centrals de coure de Telefónica, deixant d'oferir serveis sobre aquest mitjà. Ara, la fibra òptica arriba fins als edificis i instal·lacions, proporcionant connexions més ràpides i estables.
-
Xarxes mòbils
La cobertura de telecomunicacions mòbils s'ha ampliat amb el desplegament d'antenes en espais públics i privats. Aquestes antenes transmeten i reben senyals de ràdio freqüència, i poden ser reforçades amb altres elements com satèl·lits. La xarxa 5G s'ha desplegat àmpliament, oferint una cobertura extensa i millorant la qualitat de les connexions mòbils.
Elements clau per a la infraestructura
-
Elements de transmissió i de recepció
Es tracta de les antenes que poden ser grans antenes ubicades a torres dedicades, antenes sobre de les teulades, o bé petites antenes amb els elements auxiliars de transmissió a peu de carrer.
-
Suports i torres per les antenes
L'altura és un factor important per la distància en què un element de transmissió pot emetre. A més altura més gran serà la distància de cobertura. Per tant es busquen llocs elevats o bé es tracta de dissenyar suports elevats per suportar aquests elements de transmissió i de recepció.
-
Canalitzacions
Per la xarxa de cable (fibra òptica) es poden considerar tres possibilitats de desplegament: pel subsol, per via aèria i per façana.
-
Infraestructures auxiliars
Les xarxes que donen servei a la via pública, com per la senyalització o la monitorització del trànsit, requereixen d’armaris a peu de carrer per ubicar-hi els elements de comunicació necessaris. A mesura que les noves generacions de telefonia mòbil, com el 5G, donin lloc a nous serveis, serà més necessari disposar d’espais per a ubicar-hi aquests armaris o fins i tot sales tècniques on hi conviuran els elements de distribució i de comunicació amb sistemes de computació.